A project to improve public transport

and the transport infrastructure of the city of Belgrade, the Republic of Serbia

Reconstruction of Slavia Square and Osvobojdenie Blvd. / Phase I /

Reconstruction of “Rozeveltova” Street and “Mieje Kovachevitsa” Str. / Phase II /

Reconstruction and electrification of the railway line

on corridors IV & IX – Plovdiv-Svilengrad

Phase 1: Krumovo Station km 164 + 575 – Parvomay Station km 202 + 300

Reconstruction and electrification of the railway line

on corridors IV & IX – Plovdiv-Svilengrad

Phase 2: Parvomai Train Station 202 + 300 – Dimitrovgrad Station km 231 + 560

Rehabilitation of the railway infrastructure on the sections

of the Plovdiv – Burgas railway line

Rehabilitation of Central Station Sofia

Consultancy services under TDA

– assessment of the compliance of the investment projects and construction supervision of the site: “Rehabilitation of runway and runway / Varna / Varna Airport”

Conservation, restoration and socialization

of Thracian mounds “Helvetia” and “Grifoni”

DEVELOPMENT OF TOURIST INFRASTRUCTURE

Sanctuary “Nymphs of Aphrodite” – Monastery “Holy Virgin”, Dimitrovgrad municipality

INTERMODAL TERMINAL IN SOUTH CENTRAL REGION

Planning in Bulgaria – Plovdiv

Repair building and vertical planning of Sliven railway station

Anti-erosion reinforcement of skate

Zones “A”, “B” and “C”, Varna / Alley Parva, Varna /

Madara Railway Station

Madara village, Shumen municipality

Modernization of an existing oil mining workshop

/ oil extraction workshop / and its accompanying sites “, town of Provadia

Expansion of warehouse

for unrefined oils, town of Provadia

Factory for the production of explosives

the town of Devnya, Municipality of Devnya

Doubling and electrification

of the Karnobat-Sinelot

railway line km 75 + 000 to km 87 + 540 ”

Strengthening the track

in the Yunak-Velichkovo interstate along the 3rd railway line

from km 109 + 000 to km 117 + 000

Reconstruction and drainage

at the entrance to Asparuhovo station

Hull workshop 3

and complementary development in the RDP 10 for ship repair activities

Devnya Cement AD: Silo for ash

Mechanized renewal of the track

In the radius of Raduntsi – Dabovo with a length of 3 503,50 meters, repair of steel bridges at km 215 + 452 and km 216 + 355 and reinforcement of tunnels №№ 23, 24 and 25 on the 4th railway line.

Reconstruction of the design speed in the interlayer

Kurilo – Ribrovo road № 2 from km 13 + 294 to km 23 + 632 with a length of 10 338 m, with adjacent stations: Kurilo station – tr. 2 with a length of 980 m and adjacent arrows № 8, 10, 14, 9 and 3, between arrows № 10 and № 14 with a length of 46 meters and between arrows № 3 and № 9 with a length of 22 meters and station Rebrovo – point 2 with a length of 891 meters and adjacent arrows № 1 and 2

Modernization of the railway infrastructure

Sofia district

Modernization of the railway infrastructure in order to increase the throughput by improving the track parameters and increasing the design speeds of the III Sofia-Karlovo-Zimnitsa railway line from km 26 + 140 to km 100 + 525 in the territory of the Sofia region

Stage 1: Makotsevo Station from km 47 + 435 to km 48 + 660, Makotsevo – Dolno Kamartsi from km 48 + 660 to km 54 + 397, station Dolno Kamartsi from km 54 + 397 to km55 + 215, Dolno Kamartsi-Mirkovo stop Bunovo) from km 55 + 215 to km 61 + 325;

Stage 2: Mirkovo Station from km 67 + 357 to km 68 + 541, Mirkovo – Zlatitsa (to Chelopech station) from km 68 + 541 to km 74 + 763, Zlatitsa station from km 79 + 020 to km 80 + 012, Zlatitsa – Pirdop from km 80 + 012 to km 83 + 385;

Major overhaul of tunnel 3 under III

– the main railway line from km 56 + 605 to km 59 + 638